Back to blog
Diary

Tuesday: The Plug and the Manual Belong on the Product Line

4 min read
The plug and the manual belong on the product line. Put both on the product line, and ask for every document by name.

From the operations desk

Two facts that were in the chat and not on the record

The plug standard a unit ships with and the language of its manual decide whether goods you have not seen are the right units for the market they land in. On Tuesday morning a replacement-product search for a rechargeable outdoor cleaning tool closed on a single line of product record with one note appended: the charger standard for the destination market and the manual language. The seller approved it that afternoon.

Both had been through the thread as chat messages already. The plug had been agreed earlier in the week and acted on; the manual question, asked the day before, had come back as a list of countries, which does not answer it. What the product line did was put both beside the item, where the buying side reads them.

Elsewhere on the day a seller sourcing an electrical beauty appliance was sent the in-stock item and the plug type came with it, unasked. Neither fact can be changed once the stock is standing in a warehouse, so settle both on the exact unit before the listing goes up — what else a destination decides about a unit is worth reading before you choose between suppliers.

An assurance was given, and no document stood behind it

A prospect preparing to list a sports product into a European market asked, before ordering, for the factory's conformity documents. The factory's answer was that it holds no certificate and the goods are up to standard in general terms. He wrote back the same evening: which conformity documents and test reports the factory can supply for that item, whether any safety test report exists, and all of it sent before he orders.

A statement that a product meets a standard is not evidence that anyone tested it. His answer came the following afternoon, and this time with no assurance attached: the factory had carried out no certification. Before asking a factory to commission one, read why product certificates come with an MOQ.

Another prospect, building an electrical wellness range for a European market, wrote the same list one stage earlier, before any sample existed: six lines, every one of them a fact or a document rather than a preference — the performance figures, the distance they are measured at, the component count, the real power draw, the European conformity and restricted-substances certificates, and any test reports the manufacturer holds. A list like that is a filter, and it decides which manufacturers are worth a sample.

What came back covered the physical specification and the minimum order quantity. The certificates and the test reports were not in it, and the answer on those was still outstanding when the thread moved on to minimums. Number the lines on your own list and ask for a status against every one of them, including the lines nobody has answered yet.

When a document does come back, a certificate only helps when it matches the product is the check to run on it before you list it.

An unanswered document request is not a slow yes

A documentation request does not expire and it does not answer itself. If you have asked for the health and safety documents behind a cosmetic range and nothing has come back, silence is not agreement and it is not a refusal either: put a date against the request, name the person on your partner's side who owns it, repeat it on its own rather than inside the next order message, and keep the range off your product page until a document arrives.

Get the plug, the manual and the document names onto the quote

Three things to obtain from your partner, in writing. First, the plug standard and the manual language for the exact unit that will ship to you, on the quote rather than agreed in chat: the unit in the warehouse is configured for somewhere, and that somewhere has to be your market. Second, on any conformity claim, the name of the document that exists and who issued it, or a plain statement that none exists and who would have to commission the testing.

Third, what your inspection covers — checked against the approved specification you supplied, plus visible damage, included parts, packing condition, any named defect and defects learned on that product over time. A conformity document is not something an inspection produces, so ask for it separately, before the money moves.